Meeting Update 0828

What I've been doing:

Revised the ApJ paper: one more appendix on initial field setup, one more paragraph on instabilities with one additional figure to support it, misc modifications according to Eric and Adam's previous suggestions, and also the referee response from the HEDLA proceeding. (Both Eric and I thought it is good enough to submit, so waiting on Adam's feedback.)

Making test modules for the gold version: 50% done.

Adapting the multiphysics code to the gold version: currently working on the communication stuff of the subcycle control routines.

Resistive paper: low res runs are shown in a previous blog post, high res runs are currently running on bluegene (We could have some movies to look at but unfortunately I found something wrong in the job that was running last Friday. So I started everything over new, and they just started running this Monday). It looks like we can finish them by the end of September. We will do R=10,100,1000,infinite for both Bx, By configurations, and also one hydro case and one Mach 10 case (the jobs use the experiment setup data the same as the NLUF proposal, Mach is 5) for comparison's sake, according to Gianluca's advice.

Qual: I'm planning on an October date. Eric Blackman and Chuang Ren both have time and have agreed to help. Currently waiting for Eric Mamajek's response. (Dan will not be available during that time frame) I will probably start writing up the brief in early September.

Comments

No comments.